Railroad tracks – 5.10a (trad)

Recent Sendage:

  • 5.10b
    2023-05-22
    Harder than it looks.
  • 5.10a
    2023-05-02
  • 5.10a
    2018-11-09
    Crux is straight off the deck
  • 5.10a
    2018-05-03
    Top Rope Send, mixture of all sorts of jams and great rest in the middle with a hard start.
  • 5.10a
    2017-04-05